Commercial

COMMERCIAL

 

 

 

Adelaide shores internal view

Williamson Enterprises Pty Ltd is constantly looking to add high profile projects from the commercial sector to its list of achievements. Most recently Williamson Enterprises Pty Ltd  was involved in the Adelaide Shores New Depot Redevelopment Project.

This project was designed for the frame and roof sheeting to be built on the ground, providing a safer and more efficient building solution. Upon completion, the roof frame and roof is installed using 3 x 95 tonne cranes to lift it all into place over the footings.  With the roof lifted and secured to the footings the final stages of construction e.g. cladding, follow to complete  the shed.

It is an innovative way of construction both being safer and more time efficient.

This looks to be the way of shed and steel construction in the future!

We specialise in the following:

  • Footing Construction– including design/layouts/boring/concrete pouring;
  • Steel Erection – frame construction;
  • Roof Erection –in addition to standard steel erection method we offer the option for the frame and roof sheeting to be built on the ground then crane lifted onto the footings. This option is a safer and more time efficient way of steel and roofing erection;
  • Cladding- -Bondor/Custom Orb Cladding/Concrete/Colorbond/Zinc; and
  • Roofing – Colorbond/ Zinc Roofing/ Composite Roofing/Down pipes/ Gutters (including Box Gutters).